Guilin Hexin Waterproof And Decoration Material Co., Ltd.

Bi-component bathroom waterproof material HX-K11

Bi-component bathroom waterproof material HX-K11
Product Detailed

1.environmental friendly
2.can be used in drink-water pool
3.especially for rainy area
4.super Cohesiveness
5.easy operation

 Product interduction

HX-K11 is a bi-component waterborne waterproof coatings,using high polymer emulsion and high quality cement as base components addition with different function additives. It’s a new type of green waterproof material that has good effect of waterproof and anti-seepage, excellent durability and cohesiveness. It have met with great favor in the market and has a high cost performance.

 

Product characteristics

1. non-toxic, non-pollution, harmlessness and can be used in the waterproof of drinking-water pool.

2.can be constructed on the wet  base surface,especially adapting to the waterproof of rainy areas.

3. excellent Cohesiveness with many kinds of materials’ dry or wet surface. It can paste ceramic tile right after completion.

 

Application  scope

–It can be widely use in Leak-proof, anti-seepage of building roof, underground projects, interior and exterior wall, kitchen, lavatory and pool.

 

Packaging and storage

1.Plastic barrels and woven bag with liner inside sealed packaging. 10kg/group, 20kg/group, 34kg/group

2.Be storage in cool dry place, against sunshine and frozen.

3.Since the day of production the expiry time is 12 months. It can still be used if it beyond the expiry time while it’s tested qualified.

 

Performance indexes (executive standard: JC/T 984—2005)

NO.

experimental projects

technical indicators

1

Appearance

after mixing liquid material no precipitation, power not agglomerated and homogeneous

2

Setting time (h)

Initial setting time(min)

≥45

Final setting time(h)

≤24

3

Penetration  pressure(MPa)

7d

≥1.0

28d

≥1.5

4

Adhesion Strength (MPa)

7d

≥1.0

28d

≥1.2

5

compressive strength(Mpa)

28d

≥24.0

6

Flexural Strength(Mpa)

28d

≥8.0

7

Proportional of press and break

≤3.0

 

Notices

1. Construction temperature should be above 5 oC. Open-air project avoid rainy days or avoid constructing on base surface with water.

2. Do not do second coating until the first coating is dry.  The construction of protective layer or decorative layer should be only after the first coating is dry.

 

Trade item

Port   Guangzhou/Shenzhen

MOQ  1Ton/Tons

Lead time   3-5days

Payment  30% advance, 70% balance should be paiy once production finished.

 

 

 



Copyright Notice @ 2008-2022 B2BAGE Limited and/or its subsidiaries and licensors. All rights reserved.