Guilin Hexin Waterproof And Decoration Material Co., Ltd.

HX-SJ Cement based permeate crystalization waterproofing coating

HX-SJ Cement based permeate crystalization waterproofing coating
Product Detailed

1.can be use in drinking water pool
2.permanent waterproof
3.good resistance of acid and alkali
4.construct on wet surface

Product characteristics

1.Green product, can be use in the waterproof of drinking water pool.

2.Permanent waterproof function, the waterproof effect can be the same duration as buildings.

3.Good resistance of acid and alkali. It can protect the concrete and rebar from corrosion.

4.Easy construction-- It can be construct on the wet surface.

5.Could penetrate into the tiny crack of concrete structure and will fill it out.

 

Application scope

Can be widely use in the sealed waterproof and corrosion protection of concrete structures, such as basement, lavatory, tunnel, dam, pool, watering place and sewage treatment pond.

 

Construction points

–The treatment of grassroots

 the grassroots should be smooth, sound and clean, no accumulating water, no dust, and no stain. The construction of dry base surface should do only after spraying water.

–Burdening

ratio according regulation (HX-SJ: water 1:0.25~0.3, weight ratio), exact measure. Put HX-SJ into the mixing materials container then add water non-pollution water into it and stir by hand if it’s small quantity, use motor stirrer (300~450r/min) about 5 minute if it’s large quantity. The blend materials should be used up in 20 minutes. The use amount of material is 1.0~1.5kg per square centimetre.

–Construction

can be construction by scraping, rolling or plastering, but should assure that no leak painting, no stacking and no repeating painting. The second construction should only after the first construction is dry for 24 hours and the base surface has been wetting by water. When the last progress is finished it reaches the demand thickness.

–Maintenance

spray water when the coating get initial setting, 3~4times each day, little more times at hot or dry day, the spry should last for 5 days. The construction in inner room or wet condition needn’t do the maintenance.

 

Performance indexes (executive standard: GB 18445—2001)

No.

                                          project

Performance indexes

   I

     II

1

Setting time

Initial setting time(min)

≥20

Final setting time(h)

≤24

2

Flexural Strength(Mpa)

7d

≥2.80

28d

≥3.50

3

compressive strength(Mpa

7d

≥12.0

28d

≥18.0

4

cohesive degree of wet base surface(MPa)

≥1.0

5

Anti-osmotic Pressure,28d(MPa)

≥0.8

≥1.2

6

Second time anti-osmotic Pressure , 56d(MPa)

≥0.6

≥0.8

7

Osmotic pressure ratio, 28d(100%)

≥200

≥300

 

Notice

Construction temperature should be above 5 oC. Open-air project avoid rainy days or avoid high temperature construction which suggest construction in the morning or evening.Make protection layer above the waterproof layer if people or vehicle should pass through it. Do not construct limy mortar above the waterproof layer.After the construction of the back surface of water it should be more than 10 days for the hardening of the waterproof layer or it can not be put under hydrostatic pressure.

 

 



Copyright Notice @ 2008-2022 B2BAGE Limited and/or its subsidiaries and licensors. All rights reserved.